The 8.7-km-long tunnel will divert surplus water from the Chenab basin into the Beas river system, which could ring alarm bells in Pakistan
Govt Fixes July 2029 Deadline To Link Chenab To Beas Basin. Here's How The Blueprint Looks | Exclusive

