Monday, May 4, 2026
30.1 C
New Delhi

Roads, Railway To Zoji-La Tunnel: How Ladakh Got Infrastructure Boost

Published By :

Last Updated:

From 2020 to March 2025, Centre has provided Rs 20,660 crore for road development of Ladakh. These roads have reduced travel time and promoted tourism

Around 1,670 kilometres of additional roads have been constructed or blacktopped in Ladakh since it was granted Union Territory status in 2019. (PTI)

Around 1,670 kilometres of additional roads have been constructed or blacktopped in Ladakh since it was granted Union Territory status in 2019. (PTI)

After becoming a Union Territory in 2019, Ladakh has significantly improved its road infrastructure. It is now well equipped with snow-clearance machinery to ensure road connectivity during heavy snowfall.

Around 1,670 kilometres of additional roads have been constructed or blacktopped in Ladakh since it was granted Union Territory status in 2019.

Recommended Stories

From 2020 to March 2025, Centre has provided Rs 20,660 crore for road development of Ladakh. These roads have reduced travel time and promoted tourism.

The under-construction Zoji-La Tunnel is aimed at providing year-round connectivity between Srinagar and Leh, via Dras and Kargil. The tunnel is set to become India’s longest road tunnel and Asia’s longest bi-directional tunnel.

The 255 km all-weather Darbuk-Shyok-DBO (DS-DBO) road, linking Karakoram Pass to Leh via Galwan, now enables year-round strategic access to the frontier.

Approved in 2023, the 4.1 km long Twin-Tube Shinkun La tunnel to be constructed at around 15,800 feet on the Nimu – Padum – Darcha Road to provide all-weather connectivity to Leh. Once completed, it will be the highest tunnel in the world.

In March 2024, the BRO completed the 298-km Nimmu–Padum–Darcha road, creating a third vital axis to connect Ladakh with the hinterland alongside the Manali–Leh and Srinagar–Leh routes.

The government is also building a 130-km alternative road to Daulat Beg Oldie (DBO) military outpost in eastern Ladakh. This route, via Nubra Valley, offers enhanced security compared to the existing road, which is easily monitored by China.

In September 2025, BRO’s Project Vijayak marked its 15th Raising Day in Kargil with a ₹1,200 crore infrastructure push. Over 15 years, it has built 1,400 km of roads and 80 bridges in Ladakh, including the record reopening of Zojila Pass in just 31 days.

The Bilaspur-Manali-Leh railway project has received an allocation of Rs 1.31 lakh crore. At present, the journey from Delhi to Leh takes 40 hours (by road), but after the railway line is ready, it will reduce the travel time in half to 20 hours.

Nyoma Airfield (Sep 12, 2023): BRO strategic project to build the world’s highest fighter airfield at ~13,700 ft with a cost of approx 218 crore.

In 2021, BRO blacktopped the Umling La road at an altitude of 19,300 feet, creating the world’s highest motorable road as certified by Guinness World Records, and giving Ladakh a new symbol of connectivity and high-altitude tourism.

About the Author

News Desk
News Desk

The News Desk is a team of passionate editors and writers who break and analyse the most important events unfolding in India and abroad. From live updates to exclusive reports to in-depth explainers, the Desk d…Read More

The News Desk is a team of passionate editors and writers who break and analyse the most important events unfolding in India and abroad. From live updates to exclusive reports to in-depth explainers, the Desk d… Read More

News india Roads, Railway To Zoji-La Tunnel: How Ladakh Got Infrastructure Boost
Disclaimer: Comments reflect users’ views, not News18’s. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Loading comments…

Read More

Go to Source

Hot this week

Arjun Erigaisi restores Indian representation in Classical top-10 after beating Nils Grandelius in Sweden

Indian Grandmaster Arjun Erigaisi was back among the top-10 in the latest Classical live ratings after his third-round victory over Swedish Grandmaster Nils Grandelius in the ongoing TePe Sigeman & Co Chess Tournament in Malmo, Sweden. Read More

West Bengal orders strict safeguarding of govt files, senior officials held accountable

Chief Secretary Dushyant Nariala directed all departments to safeguard government files and prevent removal or tampering, as the BJP secured a landslide victory in the state ending 15 years of TMC rule Go to Source Read More

‘A day of faith in democracy, politics of performance’: Modi on assembly elections results

The BJP won 66 seats in the 294-member West Bengal assembly and was leading in 138 constituencies, while the TMC bagged 30 and was ahead in 53. Read More

Assam Assembly Election 2026: BJP secures historic third term; full list of winners

Assam election results 2026 are being awaited as 126 constituencies will decide whether the BJP-led NDA retains power or the Congress-led opposition makes a comeback Go to Source Read More

Summer Is Here: This Is How Being Dehydrated Impact Digestion, Skin, Brain Function

Often, the solution to better well-being is simply to stay hydrated at all times and to seek timely medical help. Read More

Topics

Arjun Erigaisi restores Indian representation in Classical top-10 after beating Nils Grandelius in Sweden

Indian Grandmaster Arjun Erigaisi was back among the top-10 in the latest Classical live ratings after his third-round victory over Swedish Grandmaster Nils Grandelius in the ongoing TePe Sigeman & Co Chess Tournament in Malmo, Sweden. Read More

West Bengal orders strict safeguarding of govt files, senior officials held accountable

Chief Secretary Dushyant Nariala directed all departments to safeguard government files and prevent removal or tampering, as the BJP secured a landslide victory in the state ending 15 years of TMC rule Go to Source Read More

‘A day of faith in democracy, politics of performance’: Modi on assembly elections results

The BJP won 66 seats in the 294-member West Bengal assembly and was leading in 138 constituencies, while the TMC bagged 30 and was ahead in 53. Read More

Assam Assembly Election 2026: BJP secures historic third term; full list of winners

Assam election results 2026 are being awaited as 126 constituencies will decide whether the BJP-led NDA retains power or the Congress-led opposition makes a comeback Go to Source Read More

Summer Is Here: This Is How Being Dehydrated Impact Digestion, Skin, Brain Function

Often, the solution to better well-being is simply to stay hydrated at all times and to seek timely medical help. Read More

Tamil Nadu Election Results 2026: Full list of winners and losers from TVK, DMK & AIADMK

NEW DELHI: Tamil Nadu appears to be witnessing a dramatic political churn as counting trends from the 2026 Assembly elections point towards a breakthrough performance by the Tamilaga Vettri Kazhagam, led by actor-turned-politician Jos Read More

From fish curry to rasmalai: The flavours of BJP’s election victory celebrations

Representative images Counting trends across West Bengal on Monday triggered celebrations among BJP workers as the party moved ahead in key contests, with supporters marking the occasion through food-based celebrations at counting ce Read More

Sivakasi election results 2026: Keerthana S of TVK wins, Congress’ Ashokan G finishes second

Keerthana S of Tamilaga Vettri Kazhagam secured a victory in the election, while Ashokan G of the Indian National Congress finished in second place. Read More

Related Articles