Thursday, June 18, 2026
34.8 C
New Delhi

How Milan’s Olympic Village will become housing for 1,700 students after the 2026 Games

How Milan's Olympic Village will become housing for 1,700 students after the 2026 Games

Every host city builds an Olympic village, and almost every host city then spends years deciding what to do with the empty buildings once the athletes leave. Milan skipped that problem. Architects at Skidmore, Owings & Merrill, working with Italian developer COIMA, designed the Milano Cortina 2026 Olympic Village on a 19th-century railway yard in the Porta Romana district, with its second life built into the blueprint, not added afterwards. The complex opened to 1,300 athletes in February 2026, and by September 2026, the same six residential buildings are set to reopen as Italy’s largest affordable student housing development, offering 1,700 beds for the academic year. The transformation is expected to take four months from the closing ceremony to student move-in.

Milan designed its Olympic Village to become student housing from day one

What sets the Porta Romana project apart is timing. According to SOM’s official project announcement, the firm was selected to design the Olympic Village in 2021, years before the Games, with its post-Olympic role as student housing built into the brief from the start rather than added later. COIMA founder and CEO Manfredi Catella described the approach as creating spaces, functions, and materials already designed for their eventual conversion. That early planning meant the project never had to choose between serving athletes well and serving students well afterwards; both uses were designed into the same architecture simultaneously, a sharp departure from the usual Olympic pattern of building first and worrying about reuse only once the closing ceremony has already happened.

What SOM and COIMA actually built in Milan’s Porta Romana district

The completed complex sits on a former 19th-century railway yard and combines six new residential buildings constructed in mass timber with two restored historic structures, including the former Squadra Rialzo locomotive workshop. According toSOM’s project page, the development covers a gross building area of roughly 53,380 square metres and includes 40,000 square metres of green space woven through the site. SOM design partner Colin Koop has said the buildings were designed to draw on Milan’s historic architectural scale and materiality rather than imitate the city’s older fabric directly. Construction began in January 2023 and, according to COIMA’s official press release, the buildings were handed over to the Fondazione Milano Cortina 2026 ahead of schedule.

How the four-month conversion from Olympic Village to student housing works

Because the conversion was built into the design rather than retrofitted afterwards, the turnaround between Olympic use and student housing is unusually fast. The Village welcomed 1,300 athletes when the Games opened in February 2026, and according to SOM, the same buildings are due to be permanently converted into Italy’s largest affordable student housing development by September 2026, in time for the new academic year. Around 30 per cent of the roughly 1,700 units will be offered at subsidised rents, with the development already pre-qualified for support under an Italian Ministry of Universities and Research funding decree that could reduce rents for residents for up to twelve years.

Why Milan’s Olympic Village avoids the usual Olympic legacy problem

Olympic infrastructure has a long history of being abandoned once the Games end, from empty venues left over from Athens 2004 to Rio’s underused 2016 Olympic Park. Milan’s approach treats the Games themselves as little more than a funding mechanism and a deadline, rather than the building’s true purpose. COIMA’s Catella has argued that the project sets a new benchmark for sustainability not only through its environmental performance but through what happens to it once the Games are over. SOM has similarly described the Village as representing a new model for sustainable Olympic development, one designed to continue serving its surrounding community for decades after the athletes have departed.

How the Olympic Village fits into Milan’s larger Porta Romana master plan

The Olympic Village is only the first piece of a far larger redevelopment. According to COIMA, the project forms the opening phase of the wider Scalo di Porta Romana urban regeneration plan, which is intended to eventually deliver around 105,000 square metres of residential buildings across the district, with half designated as affordable housing alongside new commercial space and public gardens. Once the conversion is complete, the Olympic Village Plaza is planned to become a neighbourhood square lined with shops, bars, restaurants, and cafés, while the surrounding park and railway-side buildings are converted into further affordable housing for the district as a whole. Go to Source

Hot this week

Who is Abraham Alvarez? Illegal immigrant charged in WH UFC attack plot targeting Trump

Abraham Alvarez is one of five co-conspirators in a drone attack plot targeting the UFC event at the White House A Mexican national who entered US as a child and later received protection under a programme introduced during Barack O Read More

New York mayor Zohran Mamdani pushes to end horse carriage industry after Indian teen Romanch Mahajan’s death

New York mayor, other leaders push to ban horse-drawn carriage rides after Indian teen Romanch Mahajan’s death. Read More

As Shiv Sena turns 60 today, rival camps set for verbal joust

As Shiv Sena turns 60 today, rival camps set for verbal joust MUMBAI: With ‘Operation Tiger’ now almost complete and the merger of rebel Sena UBT MPs with the deputy CM Eknath Shinde-led Shiv Sena said to be a formality, Read More

HDFC said to have put freeze on TMC account, Didi’s faction denies it

A senior bank officer said the account had been put on ‘a debit freeze’ KOLKATA: Former West Bengal sports minister Aroop Biswas – now being probed for last Dec’s “Messigate” at Salt Lake stadium Read More

Shekhar Suman recalls father detecting son Aayush’s illness

Shekhar Suman recalls father detecting son Aayush’s illness, says wife Alka heard his voice years after his death (Image credits: Instagram) Shekhar Suman has opened up about one of the most painful chapters of his life — the i Read More

Topics

Who is Abraham Alvarez? Illegal immigrant charged in WH UFC attack plot targeting Trump

Abraham Alvarez is one of five co-conspirators in a drone attack plot targeting the UFC event at the White House A Mexican national who entered US as a child and later received protection under a programme introduced during Barack O Read More

New York mayor Zohran Mamdani pushes to end horse carriage industry after Indian teen Romanch Mahajan’s death

New York mayor, other leaders push to ban horse-drawn carriage rides after Indian teen Romanch Mahajan’s death. Read More

As Shiv Sena turns 60 today, rival camps set for verbal joust

As Shiv Sena turns 60 today, rival camps set for verbal joust MUMBAI: With ‘Operation Tiger’ now almost complete and the merger of rebel Sena UBT MPs with the deputy CM Eknath Shinde-led Shiv Sena said to be a formality, Read More

HDFC said to have put freeze on TMC account, Didi’s faction denies it

A senior bank officer said the account had been put on ‘a debit freeze’ KOLKATA: Former West Bengal sports minister Aroop Biswas – now being probed for last Dec’s “Messigate” at Salt Lake stadium Read More

Shekhar Suman recalls father detecting son Aayush’s illness

Shekhar Suman recalls father detecting son Aayush’s illness, says wife Alka heard his voice years after his death (Image credits: Instagram) Shekhar Suman has opened up about one of the most painful chapters of his life — the i Read More

Trump’s Iran deal runs into Republican storm; Vance comes to defend

Washington, Jun 19 (PTI): US President Donald Trump’s deal with Iran to end the war faced strong pushback from fellow Republicans, who claimed that the pact did not prevent Tehran from enriching uranium and gave it a lot of money to fund its proxies Read More

German proverb of the day: ‘Crooked logs also make straight fires’

‘Crooked logs also make straight fires’ Crooked logs also make straight fires Not every piece of wood is perfectly straight. Yet when placed in a fire, even a twisted log burns just as well as a straight one. Read More

US lifts naval blockade as Iran’s supreme leader says Trump made deal ‘out of desperation’

The US-Iran agreement to extend the ceasefire centres around 14 core points, including an end to conflict “on all fronts”, an end to the blockade, the reopening of the Strait of Hormuz, for Iran to never have a nuclear weapon, and commits Read More

Related Articles