Saturday, January 24, 2026
14.1 C
New Delhi

Delhi-Mumbai Expressway: Govt Pegs Toll Collection In 245-Km Section In MP At Rs 123 Crore Annually

Reported By :
Edited By:

Last Updated:

Tolls will be collected at Chehat, Neemthur, Garoth, Dalavada, Bhuteda, Nayapura, Dhamnod, and Timarwani depending upon the usage of the road

font

The highest amount is expected to be collected from Chehat near the Rajasthan-MP border, followed by Nayapura and Timarwani in the Jhabua district near the MP-Gujarat border. (Image for Representation)

The highest amount is expected to be collected from Chehat near the Rajasthan-MP border, followed by Nayapura and Timarwani in the Jhabua district near the MP-Gujarat border. (Image for Representation)

The Ministry of Road Transport and Highways has projected annual toll revenues of Rs 123 crore from the 245-km Madhya Pradesh stretch of the Delhi-Mumbai Expressway. According to an official document reviewed by News18, the estimate covers collections from eight toll plazas along the corridor in the state.

The National Highways Authority of India (NHAI) has invited bids from private agencies to collect user fees at the eight tolls falling on the Delhi–Vadodara–Mumbai Expressway in Madhya Pradesh.

Recommended Stories

The Request for Proposal (RFP) listed that tolls will be collected at Chehat, Neemthur, Garoth, Dalavada, Bhuteda, Nayapura, Dhamnod, and Timarwani depending upon the usage of the road.

The highest amount is expected to be collected from Chehat (Rs 53.93 crore) near the Rajasthan-MP border, followed by Nayapura (Rs 23.28 crore) and Timarwani (Rs 21.37 crore) in the Jhabua district near the MP-Gujarat border. At Chehat plaza, 38 per cent of traffic is from MAVs (four-six axles), 30 per cent from two-axle trucks/buses, and only 12 per cent from cars/jeeps/vans.

The collection from other plazas is expected to be around Rs 5 crore—Neemthur (Rs 4.29 crore), Garoth (Rs 5.92 crore), Dalavada (Rs 3.49 crore), Bhuteda (Rs 5.90 crore), and Dhamnod (Rs 4.99 crore). The toll-collecting agencies will also have to maintain adjacent toilet blocks and facilities.

The bid due date is September 18 and bids will be opened the next day. As per the schedule, the award letter will be given in the following 30 days and the contractor has to start toll collection within two days of signing the contract.

The contract will run for a year, though NHAI has the option to cut it short. The winning bidder must remit revenues weekly and maintain a security deposit equal to 15 days of collections.

In 2021, roads minister Nitin Gadkari had said the Centre is expecting toll revenues worth Rs 1,000-Rs 1,500 crore every month once the entire length of the Delhi-Mumbai Expressway becomes operational.

In July, News18 had reported that the entire corridor is expected to be ready by the year-end, except a small section in Gujarat. The 245 km length of the expressway in Madhya Pradesh is operational. Once the route is fully completed, the toll collection in Madhya Pradesh will also go up.

The 1,386-km expressway is majorly divided into two parts—the 845-km Delhi-Vadodara section and the 450-km Vadodara-Mumbai section, including the JNPT spur. Currently, 774 km of the route is operational—a 650 km section between Delhi and Vadodara and 124 km in the Vadodara-Mumbai section.

Once the entire corridor becomes operational, connecting more cities with Madhya Pradesh, revenues from the state are likely to rise significantly, underlining the Delhi-Mumbai Expressway’s role as India’s most ambitious road infrastructure project to date.

About the Author

authorimg
Nivedita Singh

Nivedita Singh is a data journalist and covers the Election Commission, Indian Railways and Ministry of Road Transport and Highways. She has nearly seven years of experience in the news media. She tweets @nived…Read More

Nivedita Singh is a data journalist and covers the Election Commission, Indian Railways and Ministry of Road Transport and Highways. She has nearly seven years of experience in the news media. She tweets @nived… Read More

News india Delhi-Mumbai Expressway: Govt Pegs Toll Collection In 245-Km Section In MP At Rs 123 Crore Annually
Disclaimer: Comments reflect users’ views, not News18’s. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Loading comments…

Read More

Go to Source

Hot this week

EU Skipped Tariffs On India Over Russian Oil For Trade Deal Talks, Says US Treasury Secretary

Bessent said that before Russia’s invasion of Ukraine, Russian oil made up only 2–3 per cent of India’s total imports. After the invasion, the share rose to 18–19 per cent. Read More

MHA Tableau To Highlight Nationwide Implementation Of Naveen Nyaya Sanhitas At Republic Day Parade

MHA’s Republic Day tableau to showcase nationwide rollout of Bharatiya Nyaya Sanhita, Bharatiya Nagarik Suraksha Sanhita, and Bharatiya Sakshya Adhiniyam. Read More

Who Replaces Pakistan If They Pull Out Of T20 World Cup 2026?

Pakistan considers a full boycott of 2026 T20 World Cup. Read More

Big Bash League Final Live Streaming: Date, Venue And How To Watch Live In India

BBL 2026 Final Live Streaming in India: The stage is set for a monumental showdown as the two most successful franchises in Big Bash history, Perth Scorchers and Sydney Sixers, face off in BBL 2025-26 Final on Sunday. Read More

‘No Non-Muslims In Bangladesh Parliament’: Jamaat Candidate’s Speech Raises Alarm Over Radical Push

Sources said that this speech is nothing but a deliberate attempt to radicalise people and push them towards extremist ideology. Read More

Topics

EU Skipped Tariffs On India Over Russian Oil For Trade Deal Talks, Says US Treasury Secretary

Bessent said that before Russia’s invasion of Ukraine, Russian oil made up only 2–3 per cent of India’s total imports. After the invasion, the share rose to 18–19 per cent. Read More

MHA Tableau To Highlight Nationwide Implementation Of Naveen Nyaya Sanhitas At Republic Day Parade

MHA’s Republic Day tableau to showcase nationwide rollout of Bharatiya Nyaya Sanhita, Bharatiya Nagarik Suraksha Sanhita, and Bharatiya Sakshya Adhiniyam. Read More

Who Replaces Pakistan If They Pull Out Of T20 World Cup 2026?

Pakistan considers a full boycott of 2026 T20 World Cup. Read More

Big Bash League Final Live Streaming: Date, Venue And How To Watch Live In India

BBL 2026 Final Live Streaming in India: The stage is set for a monumental showdown as the two most successful franchises in Big Bash history, Perth Scorchers and Sydney Sixers, face off in BBL 2025-26 Final on Sunday. Read More

‘No Non-Muslims In Bangladesh Parliament’: Jamaat Candidate’s Speech Raises Alarm Over Radical Push

Sources said that this speech is nothing but a deliberate attempt to radicalise people and push them towards extremist ideology. Read More

‘Bombs hurled at police van’: EPS slams DMK govt, says law & order reduced to ‘laughing stock’ in Tamil Nadu

NEW DELHI: AIADMK general secretary Edappadi K Palaniswami (EPS) on Saturday targeted the DMK government and Tamil Nadu chief minister MK Stalin” calling him a “puppet”, and further alleging that criminals have  Read More

7 Dead, Dozens Feared Trapped As 30 Homes Destroyed In West Java Landslide

Show Quick Read Key points generated by AI, verified by newsroom Rescue teams in Indonesia are searching for survivors after a deadly landslide hit Pasirlangu village in the West Bandung region of West Java province, killing at least seve Read More

‘Governor Carney sorely mistaken’: Trump threatens 100% tariff on Canada over its potential China trade deal

Trump has warned Canada of steep tariffs, saying Washington would impose a 100 percent duty on all Canadian imports if Ottawa moves ahead with a trade deal with China. Read More

Related Articles