Thursday, April 30, 2026
38.1 C
New Delhi

Railways quietly upgrades network: 81% tracks ready for 110 kmph speed

Railways quietly upgrades network: 81% tracks ready for 110 kmph speed

Representative image

NEW DELHI: The govt informed Parliament in the last sessionthat nearly 81% of railway tracks are ready to allow trains to run at speeds of over 110 kmph, a two-fold increase compared to 2014. One-fifth of the existing tracks allow trains to run at speeds of more than 130 kmph.This is significant since the increase in sectional speeds has happened across the railway network rather than being a limited, corridor-based upgrade. As per govt data, 84,888 km out of the little less than 1.1-lakh-km of railway network has been upgraded to support speeds of 110 kmph and above and 23,477 km of this is capable of train operations at 130 kmph and above.This systemic upgrade is allowing railways to introduce new-age Vande Bharat — both chair car and sleeper trains — and Amrit Bharat trains that can run at faster speeds.

,

Experts said the upgrade of sectional speeds is also important considering that unlike countries such as China, Japan and France, which achieved higher speeds primarily through the laying of new, passenger-only high-speed rail lines, India has pursued a fundamentally different and more complex path. The Indian approach has focussed on upgrading existing tracks that carry mixed traffic — passenger and freight — which is far more challenging than building segregated high-speed corridors, as it requires strengthening track geometry, signalling, electrification and safety systems without disrupting daily operations.Railway ministry officials said India’s strategy has seen large contiguous stretches of tracks being upgraded progressively from 110 kmph to 130 kmph and further to 160 kmph.“This creates a laddered speed ecosystem rather than a sharp division between ‘slow’ conventional lines and isolated high-speed routes. Such gradation allows trains, crew training and signalling systems to evolve organically, reducing transition risks,” said an official.The speed capability is also spread across all railway zones, including freight-intensive zones such as East Central Railway, South East Central Railway and South Central Railway. “This ensures national uniformity and avoids the creation of elite, passenger-centric corridors disconnected from the rest of the network,” the official said.Railways run some of the world’s longest freight trains, carry over 2.5 crore passengers daily, operate with heavy axle loads of 22.9–25 tonnes, and maintain long welded rails, full electrification and increasingly automated signalling—all on the same tracks. No other railway system has attempted speed upgrades under such constraints at a comparable scale, they added.

Go to Source

Hot this week

Mount St. Helens eruption: How Gophers transformed a barren land in 43 years

PC: Google Gemini When Mt. St. Helens erupted in 1980, a green and vibrant landscape turned into a desolate ash and grey wasteland. Read More

‘What A Full-Circle Moment’: Priyanka Chopra’s Anomaly Joins The Reliance Portfolio, Signals A New Era For Clean Beauty In India

Priyanka Chopra Jonas will remain Creative Director as the brand prepares for a massive scale-up on Tira and offline stores. Read More

DRDO Says Fully Ready For Agni-VI As India Moves Closer To New Era Of Guided Missile Capability

DRDO Chairman Samir V Kamat said the Agni-VI project remains a policy decision, but underlined that the scientific establishment is fully prepared to move ahead Go to Source Read More

Topics

Mount St. Helens eruption: How Gophers transformed a barren land in 43 years

PC: Google Gemini When Mt. St. Helens erupted in 1980, a green and vibrant landscape turned into a desolate ash and grey wasteland. Read More

‘What A Full-Circle Moment’: Priyanka Chopra’s Anomaly Joins The Reliance Portfolio, Signals A New Era For Clean Beauty In India

Priyanka Chopra Jonas will remain Creative Director as the brand prepares for a massive scale-up on Tira and offline stores. Read More

DRDO Says Fully Ready For Agni-VI As India Moves Closer To New Era Of Guided Missile Capability

DRDO Chairman Samir V Kamat said the Agni-VI project remains a policy decision, but underlined that the scientific establishment is fully prepared to move ahead Go to Source Read More

April Market Rally: 479 Of 500 Stocks Gain As Dalal Street Stages Strong Comeback

Show Quick Read Key points generated by AI, verified by newsroom Broad market recovery saw 479 of 500 stocks gain. Sectors beaten down in March led April’s broad rebound. Read More

Big Update For Govt Employees: 8th Pay Commission Deadline Extended To May 31

Show Quick Read Key points generated by AI, verified by newsroom 8th Central Pay Commission extends submission deadline to May 31. Employee representatives requested deadline extension due to technical issues. Read More

Karisma’s children get relief, court restrains Priya from dissipating Sunjay’s assets

After the demise of Karisma Kapoor’s ex-husband Sunjay Kapur, their children Samaira and Kiaan had filed a legal case against his widowed wife Priya Sachdev. They alleged that Priya has forged Sunjay’s will. Read More

Related Articles